Gossen Metrawatt PRÜFKOFFER METRATESTER 5+ 3PVDE-tester VDE 0104 · IEC 61010-1 · VDE 0404 · DIN 43751 · VDI/VDE 3540 · V M 700 K User Manual

Product codes
M 700 K
Page of 28
GMC-I Messtechnik GmbH
11
5.6
Extension Cables with the VL2 E Accessory
5.7
Setting the Switches at the Test Case
The following settings must be made after visual inspection has been passed, and before the 
DUT is connected to the corresponding plug connectors at the test case, as well as before 
each new test:
NETZ–VDE switch (1)  
Set to “VDE” 
METRATESTER 5+ function selector switch (6) 
Set to “I
EA
 20 mA” 
Polarity reversing switch (14)  
Set to “1” 
Measuring selector switch L1-L2-L3 (2) 
Set to “L1”
5.8
Setting the Switches at the Device Under Test
Connect the device under test to the test case and switch all of its functions on, making sure 
that, for example, thermostat contacts are closed etc. 
Either
Mains Connection Sockets
VL2 E Test Adapter