method to supply warm air is your responsibility. HP will advise on warm air alternatives; however, all 
references to warm air production are your responsibility during this procedure. 
 
Cold weather power up checklist 
Site electrical 
 
Verify that all site POD critical IT feeder supply breakers are open. 
 
Verify that all site Adiabatic mechanical feeder supply breakers are open. 
POD electrical 
 
Service aisle—Verify that all site Adiabatic unit service disconnects are open. 
 
Hot aisle—Verify that all IT power drop box breakers on the power tap boxes are open. 
  
 
IMPORTANT:
  Following these steps prevent any possibility of energizing the IT load. 
  
 
IT sections A and B: 
a. 
Close all non-spare breakers and fuses within the control cabinet. 
b. 
Close and latch the control cabinet. 
c. 
Position the EPO system (on page 
) to Armed (white) or Bypass (green). 
d. 
Verify that all EPO activation buttons are in the reset position (not depressed). 
 
IT critical power feed cabinets A and B: 
a. 
Close all non-spare breakers within primary A and B and secondary A and B power supply 
cabinets. 
b. 
Close and lock electrical cabinet doors. 
c. 
Close all Adiabatic power supply feeder breakers in both the primary mechanical and secondary 
mechanical cabinets. 
d. 
Close and lock Adiabatic primary mechanical and secondary mechanical cabinets. 
 
Standard power up procedure 
Perform the following procedures in the exact order in which they are listed. 
 
Electrical 
Site electrical 
1. 
Close all site POD critical IT power feeder supply breakers and monitor them for any effects that are not 
standard. 
2. 
Close all site Adiabatic mechanical feeder supply breakers and monitor them for any effects that are not 
standard. 
POD electrical 
Close all of the site Adiabatic unit service disconnects in the service aisle.