Monogram ZV1050SFSS Installation Instruction

Page of 16
12
Installation Instructions
STEP 6  SECURE WIRING
• Route house wiring through the ceiling hole and
pull a length to reach the hood junction box,
approximately 6" below the support.
STEP 7 SIZE AND INSTALL
DUCTWORK
• Tape the wire to the left side of the frame
support to prevent damage during installation
and service.
Ceiling
Duct
Dim. A
Duct Connection
To Hood
Bottom Support 
Frame Flange
House Duct
1-3/4"
Side
View
Support
Frame
Required
Duct
Length
• Measure from house duct flange to bottom of support
frame (Dim. A).
– Add at least 1" for duct overlap at the top.
– Subtract 1-3/4" for hood insertion into the bottom
of the frame to determine required duct length.
• Cut the 8" duct length required.
NOTE:
 The bottom of the duct must be external
(female) connection to the top of the hood. The
bottom end should be flared slightly, to facilitate
installation of the hood.
• Install duct up through support frames and attach to
house ducting with sheet metal screws.
• Seal the connection with duct tape.
Ceiling
Support
Frames
Tape
House
Wiring
Left Side
View