OceanAire 2OACH3634 Manual

Page of 36
INSTALLATION INSTRUCTIONS 
 
RECEIVING—INSPECTION
 
Upon receiving your CONVERTIBLEAIRE unit, inspect the packaging 
for any damage.  All units are shipped on a skid, and packaged in a 
triple-wall carton for added protection.  In shipment, some wear may 
occur on the packaging.  If the packaging is heavily damaged or broken, 
file a claim with the freight company immediately.  Carefully unpack the 
unit and remove all wrapping materials.  Save all documentation and fill 
out the Warranty Card and mail it to Oceanaire.  
 
BEFORE INSTALLING 
 
Check the air conditioner/spot cooler for any damage. All Oceanaire 
products are thoroughly inspected at the factory and carefully 
packaged. If any damage is evident, file a claim with the delivering 
carrier immediately. 
 
ELECTRICAL REQUIREMENTS
 
 
Check the nameplate located on the back of the unit to make certain 
that the proper power is available for the unit. Refer to "Specifications" 
section for voltage and amperage requirements. For proper NEMA 
receptacles, refer to "Electrical service plug configuration".   When using 
extension cords, use the properly sized cord, and check cord voltage to 
the unit. 
 
 
TIME DELAY FUSES/CIRCUIT BREAKERS ARE RECOMMENDED 
 
 
WARNING—OPERATING THE UNIT ON 
IMPROPER VOLTAGE WILL VOID THE 
WARRANTY 
 
 
 
ACCESSORIES 
 
Verify that all accessories are correct for the model, and that they 
installed in accordance with all instructions. 
 
START-UP 
 
Install the unit in accordance with all local and state building codes, and 
install all accessories.  Allow for a clearance around the unit for future 
maintenance and/or service.  Level unit and lock casters, when 
available.  Connect power and test the LCDI on the power cord (if 
available).  Power up unit, via thermostat and check for proper 
operation.  Refer to Thermostat Operation for more details. 
16