Furuno 1834C-BB User Manual

Page of 86
 
 
2-5
2.2.2  Power supply unit PSU-008 (MODEL1964C-BB) 
Cabling 
1.  Unfasten four screws to remove the cable clamp. 
2.  Unfasten four screws to remove the cover. 
3.  Attach the VL connector of the power supply cable VL3P-VV-S2X2C-AA050 (supplied as 
installation materials) to J1 on the POWER Board.   
4.  Attach the VH and NH connectors of MJ-B24LPF0009-050 cable (supplied as 
installation materials) to these locations: VH9, J3; VH4, J4, NH13, J5. 
POWER Board 03P9419
J1 3P
VL3P-VV-S2X
2C-AA050
cable
(to 12-24 VDC)
MJ-B24 
LPF0011-050
cable
(to processor unit)
V
H
9
N
H
13
V
H
4
J3
J4
J5
Ground 
terminal
V
H
1
0
J12
N
H
1
4
J14
V
H
5
J13
V
H
2
J11
Antenna cable
RW-9771
(03S9771)
 
5.  Connect the antenna cable to these locations: VH2, J11, VH10, J12; VH5, J13, NH14, 
J14.  
6.  Lay three cables in respective slots referring to the figure above. 
7.  Reattach the cover (removed at step 2). 
8.  Reattach the cable clamp. 
9.  Connect a ground wire (local supply, IV-2sq) between the ground terminal and ship’s 
ground.