Q-Logic 6140 User Manual

Page of 250
4 – Installation
Installing the SANbox 6140 Router
4-4
FI0154601-00  C
S
Pre-installation Check List
During the initial configuration process, the system prompts you to enter the 
parameters listed in 
. Fill out the table before installation to expedite the 
configuration process.
Mount the Router
You can either place the router on a flat surface or mount it in a 19-inch Electronic 
Industries Association (EIA) rack. See the product specification for weight and 
dimensions. Rack mounting requires a QLogic rack mounting kit; contact QLogic 
for more information.
If you mount the router in a closed or multi-unit rack assembly, make sure the 
operating temperature inside the rack enclosure does not exceed the maximum 
rated ambient temperature. 
Install the Transceivers
The router supports a variety of SFP transceivers. 
„
To install a transceiver, insert the transceiver into the port and gently press 
until it snaps in place. 
„
To remove a transceiver, gently press the transceiver into the port to release 
tension, then pull the release tab or lever and remove the transceiver. 
Different transceiver manufacturers have different release mechanisms. 
Consult the documentation for your transceiver.
Table 4-2. Pre-installation Checklist
Symbolic name of this router
Management port IP address
(if not using DHCP)
Management port subnet mask
(if not using DHCP)
Management port gateway IP address
(if not using DHCP)
iSCSI Port 1 (GE-1) IP address
iSCSI Port 1 (GE-1) subnet mask
iSCSI Port 1 (GE-1) gateway IP address
iSCSI Port 1 (GE-1) iSNS IP address
iSCSI Port 2 (GE-2) IP address
iSCSI Port 2 (GE-2) subnet mask
iSCSI Port 2 (GE-2) gateway IP address
iSCSI Port 2 (GE-2) iSNS IP address