Alpha 21264/EV67 Hardware Reference Manual
Initialization and Configuration
7–7
Power-Up Reset Flow and the Reset_L and DCOK_H Pins
As BiST completes, the TestStat_H pin is held low for 16 GCLK cycles. Then,  if BiST 
succeeds, the pin remains low. Otherwise, it is asserted. After successfully completing 
BiST, the 21264/EV67 then performs the SROM load sequence (described in Chapter 
11). After the SROM load sequence is finished, the 21264/EV67 deasserts SromOE_L.
7.1.5 Clock Forward Reset and System Interface Initialization
After the deassertion of SromOE_L, the reset state machine enters the 
WAIT_ClkFwdRst1 state,  where the 21264/EV67 waits for the system to deassert 
ClkFwdReset_H. The 21264/EV67 samples the deasserting edge of ClkFwdReset_H  
to take synchronous actions. It uses this synchronous event to reset the clock forward-
ing interface, start the outgoing clocks, and deassert internal reset. The chip then waits 
264 cycles before issuing commands. The reset state machine is then in RUN and the 
21264/EV67 begins fetching code at address 0x780.
Table 7–4 lists signals relevant to the power-up flow, provides a short description of 
each, and any relevant constraints.
Table 7–4 Power-Up Flow Signals and Their Constraints 
Signal Name
Description
Constraint
ClkIn_x 
Differential clocks that are 
inputs to PLL or are 
bypassed onto GCLK 
directly
Clocks must be running before DCOK_H is 
asserted.
PLL_VDD
VDD supply to PLL
PLL_VDD 
must lead VDD.
VDD
VDD supply to the 21264/
EV67 chip logic (except 
PLL)
DCOK_H
Logic signal to the 21264/
EV67 that the VDD supply 
is good
Reset_L
RESET pin asserted by 
SYSTEM to the 21264/
EV67
Reset_L must be asserted prior to DCOK_H and 
must remain asserted for at least 100 ms after 
DCOK_H is asserted.  This allows for PLL settling 
time.  Deassertion of Reset_L causes the 21264/
EV67 to ramp divisors to their final value and begin 
BiST.
ClkFwdRst_H 
Deassertion #1
Signal asserted by SYS-
TEM to synchronously 
commence built-in self-test 
and SROM load
ClkFwdRst_H must be deasserted after PLL has 
achieved its lock in its final divisor value (about 20 
µ
s).  The deassertion causes built-in self-test to 
begin on an internal clock cycle that corresponds to 
one framing clock cycle after ClkFwdRst_H is 
deasserted.  ClkFwdRst_H can be asserted after 
one frame clock cycle. See Figure 7–1.
ClkFwdRst_H 
Deassertion #2
Signal asserted by SYS-
TEM to initialize and reset 
clock forwarding interfaces
ClkFwdRst_H must be deasserted when the Cbox 
has loaded configuration information.  This occurs 
as the first part of the serial ROM load, after BiST 
is run.  Once ClkFwdRst_H is deasserted, the 
interface is initialized and can receive probe 
requests from the 21264/EV67.