User ManualTable of ContentsSun™ StorEdge™ FC-100 Hub Installation and Service Manual1Formerly the Sun™ Enterprise Network Array™1Regulatory Compliance Statements3FCC Class A Notice3FCC Class B Notice3DOC Class A Notice - Avis DOC, Classe A4DOC Class B Notice - Avis DOC, Classe B4Declaration of Conformity11EMC11European Union-EC11Safety11Supplementary Information11Contents131. Product Description11132. Installation21133. Service3113A. SpecificationsA114Preface15Using UNIX Commands15Typographic Conventions16TABLEP1 Typographic Conventions16Shell Prompts16TABLEP2 Shell Prompts16Related Documentation17Sun Documentation on the Web17Sun Welcomes Your Comments17Product Description191.1 Sun StorEdge FC100 Hub19FIGURE11 Front of Hub20FIGURE12 Rear of Hub201.2 GBIC21FIGURE13 GBIC That Does Not Have a Bail21FIGURE14 GBIC That Has a Bail21Installation232.1 Inspecting the Hub231. Unpack the hub.232. Inspect the hub for evidence of damage.233. Save the packing materials for future use.232.2 Rackmount Placement232.3 Installing the Hub242.3.1 Tools You Will Need242.3.2 Preparing the Cabinet242.3.3 Installing the Mounting Tray in the Cabinet241. Select the correct mounting holes in the cabinet to use for the tray.242. Install the tray in the cabinet (FIGURE21).25FIGURE21 Installing the Tray in the Cabinet25a. In the front of the tray, use the Phillips screwdriver to loosely install two 10-32 screws eac...25b. In the back of the tray, use the Phillips screwdriver to loosely install two 10-32 screws each...25c. Tighten both sets of screws.252.3.4 Installing the Hub on the Mounting Tray261. Determine on which side of the tray you are going to install the hub.262. From the rear of the tray, slide the hub mounting bracket into the slots in the mounting tray ...26FIGURE22 Installing the Hub on a Mounting Tray262.3.5 Installing GBICs and Fiber Optic Cables271. Choose the hub port into which you will install the GBIC.272. Insert the GBIC into the port.27FIGURE23 Installing a GBIC and Fiber Optic Cable27FIGURE24 Installing a GBIC That Has a Bail and Fiber Optic Cable283. Connect the fiber optic cable to the GBIC.284. Route the fiber optic cable to an initiator or target.285. Connect the fiber optic cable to a GBIC in the initiator or target.282.3.6 Routing the Power Cord281. Connect the female end of the power cord to the power receptacle at the rear of the hub (FIGUR...292. Route the power cord down the right side and along the bottom of the cabinet.293. Route the power cord up through the cutout to the power distribution unit at the left side of ...294. Connect the power cord for the tray to the power distribution unit.295. Tuck the extra length of the power cord down into the pocket beneath the power distribution unit.292.3.7 Verifying the Configuration291. Power on all nodes and then the hub.292. Make sure that the Device Active LEDs are lit for active hub ports.292.3.8 Reassembling the Cabinet302.4 Troubleshooting30TABLE21 Troubleshooting30Service313.1 Installing a GBIC311. Choose the hub port into which you will install the GBIC.312. Insert the GBIC into the port.31FIGURE31 Installing a GBIC That Does Not Have a Bail32FIGURE32 Installing a GBIC That Has a Bail333. Connect the fiber optic cable to the GBIC.333.2 Removing a GBIC341. Disconnect the fiber optic cable from the GBIC (FIGURE33 or FIGURE34).342. Remove the GBIC.34FIGURE33 Removing a GBIC That Does Not Have a Bail34FIGURE34 Removing a GBIC That Has a Bail353.3 Removing a Hub361. Disconnect and remove any installed fiber optic cables or GBICs (FIGURE33).362. Disconnect the AC power cord from the hub.363. Push up on the retaining tab that secures the hub to the mounting tray (FIGURE35).36FIGURE35 Removing the Hub364. Pull the hub back and then lift it out of the mounting slots.36A37Specifications37A.1 Physical37TABLEA1 Physical Specifications37A.2 Electrical38TABLEA2 Electrical Specifications38A.3 Environmental38TABLEA3 Environmental Specifications38Size: 622 KBPages: 38Language: EnglishOpen manual