Bunn GMB-PS Guía Del Usuario

Descargar
Página de 24
Page 17
SERVICE (cont.)
SOLENOID VALVE
Location:
The  solenoid  valve  is  located  inside  the  bottom
right side of the trunk mounted on the base.
Test Procedures:
1. Disconnect the brewer from the power source.
2. Disconnect the white/red and white/green wires
from the solenoid valve. With the "ON/OFF" switch
in the "ON" upper position press the start switch.
3. With  a  voltmeter,  check  the  voltage  across  the
white/red  and  white/green  wires.  Connect  the
brewer to the power source. The indication must
be:
a) 120 volts ac for two wire 120 volt models, three
wire 120/208 and 120/240 volt models.
b) 200 to 240 volts ac for two wire 200 or 240 volt
models.
4. Disconnect the brewer from the power source,
If voltage is present as described, proceed to #5.
If voltage is not present as described, refer to 
Wiring
Diagrams and check brewer wiring harness.
5. Check for continuity across the solenoid valve coil
terminals.
If  continuity  is  present  as  described,  reconnect  the
white/red and white/green wire from the timer.
If continuity is not present as described, replace the
solenoid valve.
6. Check the solenoid valve for coil action. Connect
the  brewer  to  the  power  source.  With  "ON/OFF"
switch in the "ON" upper position press start switch
and listen carefully in the vicinity of the solenoid
valve  for  a  "clicking"  sound  as  the  coil  magnet
attracts.
7. Disconnect the brewer from the power source.
If the sound is heard as described and water will not
pass  through  the  solenoid  valve,  there  may  be  a
blockage in the water line before the solenoid valve, or
the solenoid valve may require inspection for wear,
and removal of waterborne particles.
If  the  sound  is  not  heard  as  described,  replace  the
solenoid valve.
Removal and Replacement:
1. Remove the white/red and white/green wires from
the solenoid valve.
2. Turn off the water supply to the brewer.
3. Disconnect the water lines to and from the sole-
noid valve.
4. Remove the two #8-32 nuts securing the solenoid
mounting bracket to the base. Remove solenoid
bracket and solenoid valve as an assembly.
5. Remove the two #10-32 screws and lockwashers
securing the solenoid valve to the solenoid bracket.
6. Using two #10-32 screws and lockwashers install
new  solenoid valve on solenoid mounting bracket.
7. Using two #8-32 nuts install solenoid valve and
bracket to the base of the brewer.
8. Securely  fasten  the  water  lines  to  and  from  the
solenoid valve.
9. Refer to Fig. 9 when reconnecting the wires.
ON
OFF
ST
AR
T
B
U
N
N
90 psig m
ax operating pressure
Strainer/Flow Control # 24222.0222
(Repl. Flow W
asher #20526.0222 )
(Repl. Screen #23721.0000)
.222 gpm FLOW
P2267
P1174
27479 121500
FIG. 8 SOLENOID VALVE
FIG. 9 SOLENOID VALVE TERMINALS
WHI/GRN to Timer TL4
WHI/RED to Timer TL1