Bunn GMB-PS Guía Del Usuario

Descargar
Página de 24
Page 18
SERVICE (cont.)
START SWITCH
Location:
The start switch is located in the right front of the
hood just to the left of faucet.
Test Procedure:
1. Disconnect the brewer from the power supply.
2. Disconnect  the  white/orange  wire  from  the  top
switch  terminal  and  the  white/yellow  from  the
bottom switch terminal.
3. Check for continuity across the two terminals on
the switch when it is held in the lower position.
Continuity must not be present across these ter-
minals in the upper position.
If  continuity  is  present  as  described,  reconnect  the
white/orange wire to the top terminal and the white/
yellow wire to the bottom terminal.
If continuity is not present as described, replace the
switch.
ON
OFF
ST
AR
T
N
operating pressure
C
ontrol # 24222.0222
s
her #20526.0222 )
n
 #23721.0000)
.222 gpm FLOW
P2267
P1175
27479 121500
FIG. 10 START SWITCH
WHI/ORN to Timer TL3
WHI/YEL to Timer TL5
FIG. 11 START SWITCH TERMINALS
Removal and Replacement:
1. Remove the white/orange wire and white/yellow
wire from the start switch.
2. Compress  the  clips  inside  the  hood  and  gently
push the switch through the opening.
3. Push new switch into the opening and spread the
clips to hold the start switch in the hood.
4. Refer to Fig. 11 when reconnecting the wires.