Bunn U3 Manuales De Servicio

Descargar
Página de 41
Page 3
SERVICE (cont.)
PUMP ASSEMBLY
J2
SET
     L
OC
K
LO
C
K
SE
T
TL
1
TL
2
TL
3
TL
4
TL
5
J1
FIG.16 PUMP ASSEMBLY
P09.60
Location:
 
The  pump  is  located  on  the  center  rear  of  the 
component bracket.
Test Procedures:
1.  Disconnect the brewer from the power source.
.  Disconnect the black wire from the black lead on 
the pump and the white wire from the black lead 
on the pump.
3.  With  a  voltmeter,  check  the  voltage  across  the 
black wire and the white wire. Connect the brewer 
to the power source. The indication must be:
 
a) 10 volts ac for three wire 10/08 volt, 10/40 
volt and 380 volt models).
 
b)  08  volts  ac  for  two  or  three  wire  08  volt 
models.
 
c)  40  volts  ac  for  two  or  three  wire  40  volt 
models.
 
d)  30 volts ac for two wire 30 volt models.
 
e) 08 or 40 volts ac for four wire 440 volt mod-
els
4.  Disconnect the brewer from the power source.
If voltage is present as described, reconnect  the wires 
to the pump. Install swing spout and position over the 
reservoir. Place the ON/OFF in the "ON" (upper) position 
and push the start switch and release. If pump does 
not run, replace the pump.
If voltage is not present as described, refer to the Wiring  
Diagrams and check the brewer wiring harness.
Removal and Replacement (Refer to Fig. 17):
1.  Disconnect the wires from the pump assembly.
.  Loosen the #8-3 screw () securing the clamp 
(3) on the fill tube (1) and slide the clamp (3) up
 
the fill tube (1).
3.  Disengage the fill tube (1) from the pump assembly 
(4).
4.  Remove the four #8-3 screws (6) securing the 
pump  assembly  (4)  to  the  component  bracket 
(7).
5.  Remove pump assembly (4).
6.  Remove pump gasket (5) and inspect, replace if 
necessary.
7.  Position gasket (5) on component bracket (7).
8.  Install  new  pump  assembly  (4)  on  component 
bracket  (7)  and  secure  with  four  #8-3  screws 
(6).
9.  Install fill tube (1) on pump assembly (4).
10. Slide clamp (3) down into position on the fill tube 
(1) and tighten screw ().
11. Refer to Fig. 17 and reconnect the wires.  
WHI from Brew Timer
BLK from Brew Timer
1
3
4
5
6
7
FIG.17 PUMP INSTALLATION
P1737
10060  080900