Cisco Cisco ONS 15310-MA SDH Multiservice Platform Guía De Instalación
![Cisco](https://files.manualsbrain.com/attachments/7380d0050044647c30f5c24bbbf5d0c0b6d9bb84/common/fit/150/50/faa183d287233c52228cfea3dbc2a127fe780f60564fcb0955d9c3d1cd23/brand_logo.png)
2
Upgrading the Cisco ONS 15310-MA SDH to Release 9.2.1.3
OL-26732-01
Before You Begin
Caution
This upgrade is supported for Releases 8.5.4 and 9.2.1 upgrading to Release 9.2.1.3. For more
information, see the
information, see the
.
Note
R9.2.1.3 supports parallel upgrades for multiple nodes in a network. In a parallel upgrade, you can
activate only one node at a time. However, you can begin activation of the next node as soon as the
controller cards for the current node have rebooted successfully (wait five minutes from the time the
SYSBOOT alarm is raised).
activate only one node at a time. However, you can begin activation of the next node as soon as the
controller cards for the current node have rebooted successfully (wait five minutes from the time the
SYSBOOT alarm is raised).
Caution
When managing end-to-end circuits participating in an ML-Series resilient packet ring (RPR) across
multiple nodes involved in a parallel upgrade, all nodes participating in these circuits must have
completed the activation before the end-to-end traffic resumes.
multiple nodes involved in a parallel upgrade, all nodes participating in these circuits must have
completed the activation before the end-to-end traffic resumes.
Document Procedures
Procedures in this document must be performed sequentially unless noted otherwise. Ensure that the
procedure is completed for each node in a given network. If you are new to upgrading the
ONS 15310-MA SDH Software, make a printed copy of this document and use it as a checklist.
procedure is completed for each node in a given network. If you are new to upgrading the
ONS 15310-MA SDH Software, make a printed copy of this document and use it as a checklist.
Each non-trouble procedure (NTP) is a list of steps designed to be accomplished in a specific order.
Follow the steps until the procedure is complete. If you need more detailed instructions, refer to the
detail-level procedure (DLP) specified in the procedure steps. Throughout this guide, NTPs are referred
to as “procedures” and DLPs as “tasks.” Every reference to a procedure includes an NTP number, and
every reference to a task includes a DLP number.
Follow the steps until the procedure is complete. If you need more detailed instructions, refer to the
detail-level procedure (DLP) specified in the procedure steps. Throughout this guide, NTPs are referred
to as “procedures” and DLPs as “tasks.” Every reference to a procedure includes an NTP number, and
every reference to a task includes a DLP number.
The DLP (task) supplies additional task details to support the NTP. The DLP lists numbered steps that
lead you through completion of a task. Some steps mandate that equipment indications be checked for
verification. When the proper response is not obtained, a trouble clearing reference is provided.
lead you through completion of a task. Some steps mandate that equipment indications be checked for
verification. When the proper response is not obtained, a trouble clearing reference is provided.
This section lists the document procedures (NTPs). Turn to a procedure for applicable tasks (DLPs).
1.
—This section contains critical
information and tasks that you must read and complete before beginning the upgrade process.
2.
—Complete the database
backup to ensure that you have preserved your node and network provisioning if you need to restore
them later.
them later.
3.
—You must complete this
entire procedure before the upgrade is finished.
4.
—You must complete this procedure to
be able to run ONS 15310-MA SDH Software R9.2.1.3.
5.
—Complete this procedure
only if you have to return to the software load you were running before activating the Software
R9.2.1.3 version.
R9.2.1.3 version.
6.
—Complete this
procedure only if you want to upgrade to Software R9.2.1.3 using Transaction Language 1 (TL1).