Cisco Cisco Catalyst 6000 Multilayer Switch Feature Card MSFC2 Guía De Instalación
2
Installing Power Boards in Cisco Ethernet Switch Network Modules
78-14282-02
Tools and Equipment Needed
Tools and Equipment Needed
You need the following tools and equipment to remove and install Compact Flash memory cards:
•
ESD-preventive wrist strap
•
Antistatic bag or mat
•
Number 2 Phillips screwdriver or flat-blade screwdriver
Adding an Optional Power Board
An optional power board can be used if the Ethernet switch network module requires external -48V
power for IP telephones. Installation and configuration of the external power suppy system is described
in the Cisco External Power Supply for Cisco Ethernet Switch Network Modules Installation Guide. Use
the Cisco Network Modules Hardware Installation Guide and platform hardware installation guide for
more information.
power for IP telephones. Installation and configuration of the external power suppy system is described
in the Cisco External Power Supply for Cisco Ethernet Switch Network Modules Installation Guide. Use
the Cisco Network Modules Hardware Installation Guide and platform hardware installation guide for
more information.
Follow this procedure to install power boards:
Step 1
Use a Philips screwdriver to remove the cover on the external power board port, as shown in
.
Figure 1
Power Board Port Cover on the Ethernet Switch Network Module
Step 2
Remove the thumbscrews on either side of the power board port. Put these in a safe place as they will be
replaced once the power board is installed.
replaced once the power board is installed.
Step 3
Guide the external connector through the power board port opening on the card faceplate.
Step 4
Insert the connector on the power board into the connector on the network module. See
for
16-port Ethernet switch network modules and
for 36-port Ethernet switch network modules.
Note
Be sure to press firmly on the power board until the board seats onto the connector.
Step 5
Insert the screws from the board installation kit through the power board into the standoffs on the
network module.
network module.
Step 6
Replace the thumbscrews on either side of the power board port. Make sure the thumbscrews are
tightened firmly.
tightened firmly.
62426
EN
NM-
ESW-
16
ESW-
16
15x 7x
14x 6x
13x 5x
FastEthernet Ports
12x 4x
11x 3x
10x 2x
9x
1x
8x
0x
Ext
Pwr
-48V
0x
8x
7x
15x
GE
10/100/
1000
Base-Tx
Gigabit Ethernet port cover
External power supply port cover