Cisco Cisco ONS 15454 SONET Multiservice Provisioning Platform (MSPP) Guía De Instalación

Descargar
Página de 48
15
Installing the Cisco ONS 15454 Four-Shelf and Zero-Shelf Bay Assembly
78-18207-01
  Installation Instructions
Note
The unit of measure for the dimensions shown in 
 is inches.
Figure 8
Raised Floor Cutout for CORE and Local
Framework Anchoring
To anchor framework to a raised floor, you must know the earthquake zone where the equipment is being 
installed. Zones 0 to 2A have the frames bolted to the raised floor through a U-channel across the bottom 
of the floor tile and stringers. Zones 2B to 4 have 1/2-inch threaded rods extending through the raised 
floor and connected to seismic anchors with coupling nuts. In all zones, standard hold-down parts are 
used on top of the floor with threaded rods of varying lengths. Anchors and hold-down material must be 
engineered for proper seismic zone.
Seismic Zones 0 to 2A
To fasten network and unequal flange duct framework to a raised floor:
Step 1
Place a 1-5/8 x 1-5/8-inch (4.13 x 4.13-cm) U-channel (with continuous slot down) under the stringers 
and use clips to cover the free ends of the U-channel where the threaded rod goes through to prevent it 
from spreading when compressed.
In the base of the frame, use the hold-down plate engineered for that frame, threaded rod, nut, washer, 
insulating bushing, and hold-down washer.
On the bottom of the U-channel, use the clip, washer, lockwasher, and nut.
Fiber
Fiber
Back
Front
25.7
5.0
4.165
35.7
0.41
9.249
17.2
4.13
6.6
8.0
4.6
7.0
6.85
3.515
2.0
20.89
5.03
3.0
3.0
6.0
4.2
4.0
0.375
34.9
2.0 for
kick
guard
Power
&
electrical
Power
&
electrical
Power
&
electrical
Power
&
electrical
21099
3