Cisco Cisco ONS 15310-CL SONET Multiservice Platform Guía De Instalación

Descargar
Página de 10
 
8
Installing the Wall Mount Brackets for the Cisco ONS 15310-CL
78-17534-01
  Install the Drip Pan
Install the Drip Pan
To install the drip pan on a chassis in an east-west orientation, line up the drip pan with the two available 
holes on the bottom wall-mount bracket, and install and tighten two hex wood screws (
To install the drip pan on a chassis in a north-south orientation, line up the two holes on the outside rails 
of the drip pan with the lowest hole on each of the wall-mount brackets, and install and tighten two 
panhead screws (
). Install and tighten two hex wood screws in the holes on the face 
of the drip pan.
Install the Cable Tie-Bar
As necessary, install the cable tie-bar (15310-TIE-BAR-19) according to the instructions that ship with 
the cable-tie bar kit. The tie-bar is used for cable management. 
 shows the tie-bar installed on a left-facing ONS 15310-CL chassis in an east-west orientation. 
Figure 6
Tie-Bar Installation on an East-West Wall-Mount Orientation
151567