Samsung AS24UUQ Manual De Usuario

Descargar
Página de 40
36
Performing the Gas Leak Tests
Make sure to check for gas leaks before completing the installation process
(connecting the assembly pipe and hose between indoor unit and outdoor
unit, insulating the cables, hose and pipe, a
door unit to the
installation plate)
To check for gas leaks on the...
Using a leak detector, check the...
Indoor unit
Flare nuts C and D.
Outdoor unit
Valves A and B.
Fixing the indoor Unit in Place
After checking for gas leaks in the system, insulate the pipe, hose and cables.
Then place the indoor unit on the installation plate.
To avoid condensation problems, place heat-resistant polyethylene foam
separately around each refrigerant pipe in the lower part of the indoor unit.
Wrap the refrigerant pipe and the drain hose in the rear of the indoor unit with
the absorbent pad.
Wind the pipe, assembly cable and drain hose with insulation tape.
Place the bundle (the pipe, assembly cable and drain hose) in the lower part of
the indoor unit carefully so it doesn’t project from the rear of the indoor unit.
Hook the indoor unit to the installation plate and move the unit to the right
and left until it is securely in place.
Wrap the rest of the pipe with vinyl tape.
Attach the pipe to the wall using clamps (optional).
C
D
A
B
Insulation
Pipes
Installation plate
Connecting wires
Drain hose
Connecting
pipes
•  Wind the pipe and hose three times to the end of the indoor unit with 
   the absorbent pad (20 mm interval).
Tightening torque for body cap 
          (Refer to the table)
Charging
    core
Spindle
Tightening torque for charging port cap 
(Refer to the table)
R-22: Diameter of the screw - 7/16-20UNF
R-410A: Diameter of the screw - 1/2-20UNF
Outer diameter 
        (mm)
Ø6.35
20~25
20~25
25~30
10~12
30~35
35~40
Ø9.52
Ø12.70
Ø15.88
Ø19.05
Tightening torque
Body cap (N•m)
Charging port cap (N•m)
  Before inspecting the leakage, use a torque wrench to close 
the cap for the service valve. (Comply with a tightening torque 
to prevent any leakage.)
 To check for any possible leakage, insert inert gas into the pipes 
connected to indoor/outdoor units and check the connection part
of the indoor/outdoor units with soap lather or liquid for leakage test.
Test part for indoor unit
Test part for outdoor unit
* 1 N.m = 10 kgf.cm