AMC pm-scc-80 am Manual De Usuario

Descargar
Página de 45
4.  Go to any display of A-xx and press DOWN key and hold it, then press ESC key 
at the same time till A-04 constant occurs. 
5.  Enter the desired password 2 (max. 4 digits) into A-04. Make sure the password 1 
in A-03 must be different from the password 2 in A-04. Finally, press ENTER key 
to finish “lock” setting.   
Above procedure completes locking the constants setting and no more 
programming selection would appear. A-01 would only display Operation only 
and would not display Constants Set. 
 
Unlock the constants setting   
1.  Enter the password in A-03 to be exactly the same as the one earlier set in A-04 
2.  When the password in A-03 matches the one earlier set in A-04, the unlocking is 
completed. A-01=Constants Set would appear again for programming.   
 
*** Main Menu*** 
Programming 
 
Group B 
Battery Setup 
 
B-01: Set Battery Voltage 
 
z  During initialization of Premium MPPT Series, it will detect and ask the installer 
to confirm the battery voltage found is correct. In almost all circumstance the 
Premium MPPT Series will correctly detect battery voltage.   
z  Use Constant B-01 to change the battery voltage if the battery voltage displayed 
by the Premium MPPT Series is different from the installed batteries. The 
selection range of the battery voltage is 12V (Factory Setting), 24V, 36V and 
48V.  
 
B-02: Set Battery Type 
 
z  Use UP or DOWN keys to allow the installer to change what type of batteries it 
is connected to (Flooded, Gel, AGM) Premium MPPT Series. The default 
“BATTERY TYPE” is GEL 
z  Please be sure to select the type which matches the system’s batteries. This 
setting controls battery charging voltages in B-06 and B-08. 
 
 
5-5