3-5
April 2004
Preparing the Pipe
1. Locate a transducer measurement point with 20 diameters of 
upstream straight run pipe and 10 diameters of downstream 
straight run pipe. In addition, the point should be at least 10 
diameters from any butt welds or flanges. Keep appropriate 
clearance on either side of the pipe for easy transducer 
installation:
150 mm (6 in.) if you are not using a junction box, or
225 mm (9 in.) if you are using a junction box.
In general, transducers are installed 180° apart on opposite sides 
of the pipe and in a horizontal plane (at 3 and 9 o’clock). Figure 
3-3 below illustrates the desired acoustic signal projection path 
for general installation; however, additional pipe surveys may 
provide data that can lead to modifications for optimal 
installation.
Figure 3-3:  Desired Projection of Acoustical Signal 
Path
Transducer
Transducer
Pipe
Signal Path
End View