Installation Data
UNRELEASED DRAFT COPY ONLY
Below Lid with Knuckles Installation Kit (ME and CE Endpoints)
For below the lid installations, a special mounting bracket (Figure 3) is available. This mounting support bracket is designed 
for use with 3/8”, 1/2” and 5/8” rebar or 1/2” schedule 40 PVC pipe.  
Figure 3:  Pit Support Bracket (Knuckles) - Top View
To install an ORION endpoint below a meter pit lid, follow these steps.
1.  Drive rebar or stake into the ground. 
 
Drive rebar or stake into the ground prior to attaching the endpoint to avoid damage.
2.   Once in the ground, secure the mounting bracket on the appropriate rebar or pipe using the enclosed washer, wing 
nut and hex head bolt provided with the bracket. 
3.  Insert the endpoint through the bottom of the bracket and thread the lock nut onto the top of the endpoint. For 
best results, mount the endpoint a maximum of 1 to 2 inches below the underside of the lid.
S
Figure 4:  Pit ORION Beneath Lid Installation
 5-11)