Badger Meter Inc 2014GWGAL Manual De Usuario

Descargar
Página de 24
GALAXY® II Gateway Receiver
Figure 15:   Bottom of gateway receiver
8 .  Remove the M12 cap from the M12 receptacle on the bottom of the network gateway receiver and discard the cap . 
9 .  Connect the M12 plug connector assembly to the M12 receptacle and tighten the locking ring in a clockwise 
direction until finger tight .
10 .  Connect the 308 connector on the other end of the power cable to the 308 connector of the AC-to-DC power supply 
and snap the anti-tamper collar over the connection .
11 .  Connect the power cord to the power supply and then plug the three prong male end of the power cord into a  
120V AC power source . The LED indicator above the M12 connection turns on with a steady green light, indicating 
the gateway power is on (Figure 16) . 
NOTE:
N
A red blinking light indicates the gateway is on internal backup battery power . No light indicates the 
gateway is not receiving power .
Figure 16:  Powered gateway
The M12 connection is complete .
Page 16 
February 2014