Appendix A contains a list of different fuse types.
Step 3
Follow the connection diagram shown in figure 5.34 to perform phase-neutral or phase-
phase line impedance measurement. Use the Help function if necessary.
L1
L2
L3
N
PE
R
E
Ro
L
PE
N
L/L1
N/L2
PE/L3
N
/L
2
L
/L
1
P
E
/L
3
Fig. 5.34: Phase-neutral or phase-phase line resistance measurement
Step 4
Check the displayed warnings and online voltage/terminal monitor before starting the
measurement. If OK, press the TEST key. After performing, the measurement results
appear on the display together with the PASS/FAIL indication (if applicable).
measurement. If OK, press the TEST key. After performing, the measurement results
appear on the display together with the PASS/FAIL indication (if applicable).
Fig. 5.35: Example of line impedance measurement results
Displayed results:
Z
Z
Line impedance
I
SC
Prospective short-circuit current
Lim
Low limit of prospective short-circuit current value
Save displayed results for documentation purposes. Refer to chapter 6.1 for further information on
setting functions and saving of measurement results (BENNING IT 120 B only).
setting functions and saving of measurement results (BENNING IT 120 B only).
Note:
- The low limit prospective short-circuit current value depends on fuse type, fuse current rating,
- The low limit prospective short-circuit current value depends on fuse type, fuse current rating,
fuse trip-out time and I
PSC
-scaling factor.
- The specified accuracy of tested parameters is valid only if the mains voltage is stable during
the measurement.
5.6 Phase rotation (phase sequence)
When connecting three-phase loads (motors and other electro-mechanical machines) to three-
phase mains installations, the correct phase rotation has to be ensured. To this end, check the
phase rotation direction (phase sequence) before the connection is made.
phase mains installations, the correct phase rotation has to be ensured. To this end, check the
phase rotation direction (phase sequence) before the connection is made.
How to test phase sequence:
Step 1
Step 1
Select function (phase rotation) with the function selector switch. The following menu
is displayed:
is displayed: