Juniper Networks SRX 210 Manual De Usuario

Descargar
Página de 200
Preparing the SRX210 Services Gateway for Rack-Mount Installation
You can mount an SRX210 Services Gateway on four-post (telco) racks, enclosed
cabinets, and open-frame racks.
NOTE: The SRX210 Services Gateway cannot be center-mounted in racks.
Table 28 on page 66 provides the list of tasks you need to perform before installing
the device.
Table 28: SRX210 Services Gateway Preinstallation Checklist for Rack-Mount
Installation
Additional Information
Task
Verify that the site meets the requirements.
Verify that the racks or cabinets meet the specific
requirements.
Place the rack or cabinet in its permanent location,
allowing adequate clearance for airflow and
maintenance, and secure it to the building
structure.
Remove the services gateway chassis from the
shipping carton.
Verify that you have the following parts available
in your rack-mounting kit for the SRX210 Services
Gateway:
Rack-mounting brackets
Mounting screws
Power supply adapter tray with screws
Adapter stopper bracket
Adjust the power supply adapter tray.
NOTE: The rack-mounting kit is not shipped with the device and must be ordered
separately.
66
Preparing the SRX210 Services Gateway for Rack-Mount Installation
SRX210 Services Gateway Hardware Guide