Hughes HN7700S Manual De Usuario
Chapter 8 • Configuring the HN router for VADB backup
64
1037753-0001 Revision A
4. Install the hex nut provided with the protection module on the
SAT IN terminal post and tighten it.
5. Reconnect the coaxial cable to the SAT IN terminal post.
Make sure the cable is securely tightened. (See the Caution
statement that follows Figure 9 on page 16.)
statement that follows Figure 9 on page 16.)
6. Connect the longer phone cable from the LINE port on the
protection module to the telephone jack (or to a splitter if
other devices share the telephone line). See Figure 55.
other devices share the telephone line). See Figure 55.
7. If you use a splitter, connect the splitter to a telephone jack.
Verifying VADB functionality
Follow these steps to verify VADB functionality:
1. Open a web browser on the installer PC.
2. Access the System Control Center Advanced Pages by typing
2. Access the System Control Center Advanced Pages by typing
192.168.0.1/fs/advanced/advanced.html
in the
browser address bar and pressing E
NTER
.
3. Verify that the VADB link is in use:
a. From the Advanced Menu,
VADB
section, click
Call status
.
b. Verify that
VADBLINK
appears in the
Link in use
field as
shown in Figure 57.
Figure 57: Verifying the VADB link
SESSION ACTIVE and VADBLINK
show that the VADB link is active.
show that the VADB link is active.