gohastings.com Hastings Entertainment Oxygen Equipment HFM-I-401 Manual De Usuario

Descargar
Página de 35
 
- 12 - 
Calibrated gas = Nitrogen (GCF
1
 = 1.000) 
Full scale range (FS
1
) = 100 slm 
Secondary gas (FS
2
) = Hydrogen (GCF
2
 = 1.0038) 
1.0038/1 = 1.0038, 1.0038 x 100 = 100.38 slm of Hydrogen 
 
 
Example 2- Changing the active gas record 
Selecting the active gas record is accomplished in one of two ways: 
1.  Hardware setting  
2.  Software setting 
  
Hardware: 
The hardware setting is selected by accessing a rotary encoder on the upper PC board in the 
electronics enclosure. When set to a number position from 0 to 7 it activates the corresponding 
gas record.  If a number greater than 7 is selected, then gas record control is passed to 
software.  
 
Software:  
See Section 3.7 Multi-Gas Calibrations and the software manual for more information about the 
software control capabilities. 
 
The software setting will override the hardware settings.  If gas records are changed through 
the software setting and the rotary encoder is not changed, the software setting will be active.  
However, when the meter is powered down and subsequently powered up, the active setting 
will be based on the rotary encoder setting. 
 
2.11. Electrical Remote Zero Connection 
The Hastings 400 Series allows the flow meter zeroing operation to be activated remotely using 
pins 8 and 9 of the analog terminal strip. (See Drawing in Quick Start Guide.)  If these pins are 
connected together, the meter initiates an internal routine that measures the current reading, 
stores it in nonvolatile memory as a zero offset, and removes this value from all subsequent 
readings. When the pin 9 is electrically isolated the flow meter operates normally. The typical 
implementation of this type of remote zeroing operation involves connecting a remote switch 
or relay to pins 8 and 9 of the terminal strip. (For more about the zeroing operation, see 
Section 3.4) 
2.12. Check Installation Prior to Operation 
Before applying gas to the meter it is advisable to ensure that the mechanical and electrical 
connections and digital communications (if applicable) are established and operating properly. 
This can be done by following the guideline procedure below: