Carrier Access 52P Manual De Usuario

Descargar
Página de 16
3
To install the front panel follow the procedure outlined 
below:
1. Firmly grasp bottom of front panel on both sides.
2. Hold front panel at a 45 degree angle to unit. Be 
sure front panel is centered with front of unit.
3. Connect top of front panel to partition rail on top 
of unit.
4. Gently lower front panel onto chassis, ensuring 
service cord is positioned through front panel slot.
NOTE: Magnets on bottom of front panel will secure 
front panel to unit.
To install locking feature on front panel be sure front 
panel is already installed on unit and follow the steps 
below:
NOTE: Two field-supplied no. 8, 
1
/
2
 in. sheet metal 
screws are required to secure front panel to chassis.
1. Remove both indoor air inlet filters to expose front 
panel engagement holes. See Figure 4.
2. Secure front panel to chassis by attaching the 
field-supplied screws into engagement holes. Do 
not over tighten. 
3. Replace both indoor air inlet filters.
NOTE: Front panel alignment may have to be 
adjusted slightly to line with chassis.
Electrical Data
3 –  230/208-v, 60 Hz
4 –  265-v, 60 Hz
Cooling Capacity (nominal)
07 –   7,000 Btuh
09 –   9,000 Btuh
12 – 12,000 Btuh
15 – 15,000 Btuh
52    PE    A    3    12    3    0    1    AA
Series Designation
PTAC (Packaged Terminal Air Conditioner)
Non-Performance
Changes 0-9
Chassis Options
AA – Standard
CP – Corrosion Protection
RC – Wall Thermostat Control (Not available
          on cooling only units)
RP – Wall Thermostat Control with
Corrosion Protection (Not available on
          cooling only units)
Packaging
1 –  Domestic
Latest Revision
A –  Z
Electric Heater Size
2 – 2.3 kW
3 – 3.4 kW
5 – 5.0 kW
Comfort Series
CE – Cooling with Electric Heat
CQ – Heat Pump
PE – Cooling with Electric Heat
PQ – Heat Pump
PC  –  Cooling Only
Premier Series
FIGURE 3 — MODEL NUMBER NOMENCLATURE
TOP PARTITION
DISCHARGE
DECK
ENGAGEMENT
HOLE
FRONT PANEL
SLOT
FIGURE 4 — FRONT PANEL INSTALLATION
 WITH LOCKING FEATURE