Operating Manual LP 33 Series 30 & 40 kVA 
7.1.3 
Start-up following the operation on manual bypass (Q2) 
 
This procedure presupposes that the load is powered by the manual bypass switch: 
•  The inverter is switched OFF; 
•  The manual bypass switch Q2 is switched ON (pos. I); 
•  The output switch Q1 is switched OFF (Pos. 0); 
•  The battery fuses F5, F6, F7 (and eventual external fuses in case of external battery) are removed. 
 
 
 
NOTE ! 
This procedure must not be used if the UPS is used as frequency converter. 
 
 
 
1.  Insert the battery fuses F5, F6, F7 and eventual external fuses in case of external battery. 
 
2.  Switch ON the output switch Q1 (Pos. I)
 
3.  Only in case it has been previously activated (* present beside 
the text RESET TOTAL OFF), restore the command total off by 
entering the screen: 
MENU/RESET TOTAL OFF 
 
LED TEST 
RESET TOTAL OFF 
* 
 
 
 
4.  Switch OFF the maintenance bypass Q2 (Pos. 0). 
 
Verify, selecting the screen METERING/Udcp and Udcn, that the 
booster voltage has reached about 215 VDC
  Udcp=215V Udcn=215V 
Ubp=164V Ubn=164V 
 
 
Charge level 
=  100% 
Autonomy = 
800min 
 
5.  Switch ON the inverter by entering the screen
MENU/COMMAND MENU/INVERTER ON 
 
COMMAND MENU 
INVERTER ON * 
INVERTER OFF 
 
 
Some seconds later the load will be transferred on inverter and 
the main screen will display: APPLICATION ON UPS 
 
LP 33          40kVA 
APPLICATION ON UPS 
= 70% 
 
 
END OF PROCEDURE