InstallatIon of vent sYsteM, sIdewall
With the route of the venting system and selection of materials completed,
as discussed in the section of this manual titled PLANNING THE VENT
SYSTEM, the through the wall vent terminal in place and the first section
of piping, up to first elbow, installed at the blower it is time to complete the
installation of the venting system for the sidewall installation.
FIGURE 22.
Before completing the installation of the venting system be sure to read
the sections of this manual discussing the proper method of cutting and
cementing PVC pipe and fittings: VENT PIPE PREPARATION.
It is recommended that the completion of the venting system start at
the blower assembly and run to the coupling on the inside wall of the
vent terminal, Figure 18A.
The  vent  system  piping  should  be  supported  every  5  feet  (1.5  m) 
of vertical run and every 3 feet (91 cm) of horizontal run. All piping 
and fittings must be joined by the proper procedures as described 
under: VENT PIPE PREPARATION.
InstallatIon of vertIcal vent sYsteM
A proper flashing or “BOOT” should be used to seal the pipe where it
exits the roof. The total vent system should not exceed the equivalent
feet of pipe as listed in Table 1.
Provide  support  for  all  pipe  protruding  through  the  roof. All  piping
should  be  properly  secured.  The  vent  system  piping  should  be
supported every 5 feet (1.5 m) of vertical run and every 3 feet (91 cm)
of horizontal run. All piping and fittings must be joined by the proper
procedures as described under: VENT PIPE PREPARATION.
FIGURE 23.
IMportant
The vent system must terminate so that proper clearances are
maintained as cited in local codes or the current edition of the
National  Fuel  Gas  Code  (ANSI  Z223.1)  or  the  Natural  Gas  and
Propane Installation Code (CAN/CSA-B149.1) and as listed below:
1.  Vent Termination must extend a minimum of 18 inches (46 cm) above
roof or 18 inches (46 cm) above the anticipated snow level to prevent
blockage of the vent termination, as shown in Figures 20 and 21.
concentrIc vent InstallatIon
This appliance is certified for concentric venting with concentric vent
kit #9003910105. Follow instructions below for proper installations.
KIt coMponents
Each kit is comprised of the following:
  Item 
Description 
Qty.
  Rain Cap 
3 in. 
1
  SDR-26 pipe 
4 in. dia. 
1
  SDR-26 pipe 
2½ in. dia. 
1
  Y Concentric Fitting 
3 in. 
1
  Installation Instructions 
194504 
1
Field  supplied  pipe  and  fittings  are  required  to  complete  the
installation.