Emerson 240V Manuel D’Utilisation

Page de 44
Installation
12
Input Wiring (TB1)
To connect the input wiring, follow these steps:
1. Locate the input wiring access, remove the knockout and 
pull the three input wires through it, allowing some slack 
for installation.
2. Secure the conduit to the rear panel of the UPS. 
3. Input Power cables connect to screw terminals on the 
Input Terminal Block located to the right of the Bypass 
Voltage Terminal. Connect the wires to the block 
connections as shown below. Using a torque wrench, turn 
the screws clockwise until tightened to the proper torque 
value (28 in-lb). Insert the ground wire through the 
grounding lug and tighten it to the proper torque value 
(120 in-lb).
Grounding Conductor Installation
An insulated grounding conductor must be identical or larger 
in size, insulation material, and thickness as the grounded 
and ungrounded branch circuit supply conductors. This cable 
must be green with or without one or more yellow stripes and 
is to be installed as part of the branch circuit that supplies 
the unit or system.
The grounding conductor is to be grounded to earth at the 
service equipment or, if supplied by a separately derived sys-
tem, at the supply transformer or generator set.
Output Wiring (TB3)
Output wiring may be configured one of two different 
ways (240/120 or 208/120). Refer to the chart below 
and the diagram at right when configuring the out-
put wiring.
Voltage
120
208
240
Between terminals
1 & 4
3 & 4
2 & 3
1 & 3
Use only the connections listed above. Other connections will 
produce nonstandard voltages.
NOTE
The Nfinity UPS contains an isolation 
transformer that generates a neutral 
conductor for the connected equipment. 
The UPS is a separately derived source 
and contains a neutral to ground bonding 
jumper. A grounding electrode conductor 
(GEC) must be installed in accordance 
with national and local wiring codes and 
regulations.
TB1
L1
L2
2
1
Note the Neutral / Earth 
jumper on the terminal 
above