Q-Logic 59021-05 Manuel D’Utilisation
4 – Installation
Powering Down a Switch
4-20
59021-05 A
10.
Display the list of firmware image files on the switch to confirm that the file
was loaded. Refer to the
was loaded. Refer to the
for more
information.
cli (admin) $>image list
11.
Unpack the firmware image file to install the new firmware in flash memory.
cli (admin) $>image unpack filename
12.
Reset the switch to activate the new firmware. This will close the Telnet
session by default.
session by default.
cli (admin) $>reset
4.4
Powering Down a Switch
Simply unplugging the switch from the power source does not allow the switch to
complete executing tasks and could lead to flash memory corruption. For this
reason, open a Telnet session and use the Shutdown command to initiate an
orderly shut down, then power down the switch. Refer to the
complete executing tasks and could lead to flash memory corruption. For this
reason, open a Telnet session and use the Shutdown command to initiate an
orderly shut down, then power down the switch. Refer to the
.