Regency IG34-NG Manuel D’Utilisation

Page de 32
7
Regency IG34 Gas Inbuilt Fireplace
INSTALLATION 
GAS PIPE PRESSURE 
TESTING
The appliance must be isolated from the gas 
supply piping system by closing its individual 
manual shut-off valve during any pressure 
testing of the gas supply piping system at 
test pressures equal to or less than 1/2 psig. 
(3.45 kPa).  Disconnect piping from valve at 
pressures over 3.45 kPa (14" w.c.).
The manifold pressure is controlled by a 
regulator built into the gas control, and should 
be checked at the pressure test point.
Note: 
To properly check gas pressure, 
both inlet and manifold pressures 
should be checked using the valve 
pressure ports on the valve.
1)  Make sure the valve is in the "OFF" 
position.
2)  Loosen the "IN" (# 3) and/or "OUT" (# 4) 
pressure tap(s), turning counterclockwise 
with a 1/8" wide fl at screwdriver.
3)  Attach manometer to "IN" and/or "OUT" 
pressure tap(s) using a 5/16" (8mm) ID 
hose.
4)  Seal and or check the pilot outlet (# 8)
5)  The pressure check should be carried out 
with the unit burning and the setting should 
be within the limits specifi ed on the safety 
label.
6) When fi nished reading manometer, turn 
off the gas valve, disconnect the hose and 
tighten the screw (clockwise) with a 1/8" 
fl at  screwdriver.  Screw should be snug, 
but do not over tighten.
S.I.T. Valve Description
1)  On-Off Solenoid Valve EV1
2)  On-Off Solenoid Valve EV2
3)  Inlet Pressure Test Point
4)  Outlet Pressure Test Point
5)  Connection for Pressure Regulator/
Combustion Chamber Compensation
6)  Pressure Regulator for Minimum and 
Maximum Outlet Pressure
7)  Gas Outlet Pressure Electric Modulator
8) Pilot 
Outlet
9)  Main Gas Outlet
10) Side Outlet
FLUE LINER 
INSTALLATION
1) Cut 
the 
fl ex liner as required.
 
2)  Mark the end of one liner to indicate 
Inlet.
3)  Connect the other end of the above liner to 
the inlet side of the termination adaptor, seal 
connection with high temperature silicone. 
Secure with gear clamp.
4)  Connect the 2nd liner to the exhaust side 
of the adaptor, seal connection with high 
temperature silicone. Secure with gear 
clamp.
5) Install 
fl ashing.
6)  Insert both liners into chimney, passing 
through the damper opening.
7)  Install termination cap.
8) Connect 
the 
marked end of the liner to the inlet  
collar of the vent connector plate marked with 
an "I", seal connection with high temperature 
silicone. Secure with gear clamp.
The Air Intake pipe must  be attached to the 
inlet air collar of the termination cap.
9)  Connect the 2nd liner to the exhaust collar 
marked with an "E", seal connection with 
high temperature silicone. Secure with gear 
clamp.
Be careful not to damage thermal insula-
tion when sliding on vent connector plate. 
This could cause blockage.
Install to AS5601 (Australia) / 
NZS 5262 (New Zealand)