Cisco Cisco StadiumVision Director Guide De Montage

Page de 71
© 2011 Cisco Systems, Inc. All rights reserved   
Page 33 of 71 
 
To power up the SV Director Server and verify its initialization and self-test, 
follow this procedure. When the procedure is finished, the appliance is ready to 
configure. 
1.  Review the 
. 
2.  Before proceeding, if the AC power cord is connected directly into the AC 
power outlet and because the AC power cord provides its own ground 
conductor, you only need to ensure that the rack has been properly 
grounded. See 
. 
3.  Plug the AC power cord into the power cord receptacle on the rear panel. 
4.  Connect the other end of the power cord to a power source at your installation 
site. 
5.  Repeat steps 3 and 4 for the second AC power supply. 
6.  Press the power button on the front of the appliance. The server should begin 
its power-up procedure.  
7.  After the operating system boots up, observe the front-panel LEDs to verify 
that your system is operating properly. See 
. 
Once the operating system boots, you are ready to install the SV Director 
software. See the Cisco StadiumVision Director Installation, Upgrade, Backup 
and Restore Guide
 for details. 
Checking the LEDs 
When the SV Director Server is up and running, observe the front-panel LEDs as 
shown in Figure 33. 
Figure 33.  SV Director Server Front Panel LEDs 
 
 
LED 
Color 
State 
Description 
Green 
On 
Power on. 
 
Off 
Off 
Power off. 
Green 
On 
Standby or ready for operation. 
 
Green 
Blinking 
Degraded operation (for example, power supply non-redundancy, 
part of system memory mapped out of BIOS). 
 
Amber 
On 
One or more critical fault conditions.