LC 1200 Manual                                                                                System Maintenance & Testing 15-1 
System  
Maintenance & Testing 
  Tag and Band maintenance 
  LC units 
 
Testing monitored zones
 
 
PLEASE NOTE: 
This chapter is intended as a guidance 
document only.  Each facility should review 
these recommendations and modify as 
necessary to meet their own unique security 
requirements.
 
Tags and Bands  
For information on cleaning Tag and Bands, see 
page 3-2. 
For information of testing a Tag’s functionality 
or a Tag’s battery life, see page 3-5. 
LC units 
LC unit covers can be cleaned with antibacterial 
wipes or hydrogen peroxide. 
Testing monitored zones  
 
Zone Functions Tested 
 
Test Equipment Required 
 
Zone, Lock Test 
 
Zone, Egress Test 
(3000 and 3101 Magnetic Locks) 
 
Zone, Delayed Egress Test 
(3101 Magnetic Locks only) 
 
Zone, Hallway Test 
 
Zone, Elevator Deactivation Test 
 
Zone, Automatic Door Deactivation Test 
 
Fire Panel Interface (FPI) Test 
Note: These tests should only be performed by 
trained personnel.  
This document defines the recommended 
periodic testing procedures for the Accutech 
security systems. Accutech recommends that 
these tests be performed (at the minimum) on a 
monthly basis. 
Periodic testing of these critical performance 
functions can help prevent undetected security 
system failures.   
Zone Functions Tested 
Accutech systems respond to RF signals 
generated by the Tags. Most conditions occur at 
a monitored zone. 
Each exit point around the area of protection 
should be evaluated to determine: 
  if doors lock and/or elevators disable when 
a Tag approaches 
  if alarms are generated due to passage of a 
Tag through an exit point 
Test Equipment Required 
You will need to designate Tags to be used 
solely for testing purposes only and a TAD.