Innovative Control Systems Inc IGWT-660098 Manuel D’Utilisation

Page de 156
LC 1200 Manual                                                                                System Maintenance & Testing 15-3 
 
Zone, Egress Test  
(3000 and 3101 Magnetic Locks) 
Most monitored door zones equipped with 
Locks are configured to generate an alarm if a 
Tag is detected in the zone and the door is open. 
This test will evaluate this operation. 
NOTE:
 In the event of a fire, all Locks are 
disabled and the door can be opened 
immediately. 
This test should be conducted selectively; create 
a rotating schedule to test a different set of zones 
each time that periodic testing is conducted.  
Test results should be written down and kept in a 
test log.  Make your own, or use the included, to 
ensure that every monitored zone is tested.  
These test reports should become part of your 
permanent quality assurance records.   
1.  Notify staff and security that you will be 
testing zone performance and alarms 
will be generated. They should pay 
special attention to traffic during this 
time. 
2.  Prop the door open. 
3.  While not in the zone, use a TAD to 
activate the test Tag. 
4.  Approach the door. An alarm should 
sound.  
5.  Record the results (pass or fail). 
6.  If the test fails to cause an alarm: 
a.  Notify staff and security of the 
vulnerable area. 
b.  Check for visible damage or 
tampering to the zone equipment. 
c.  Have a maintenance technician 
verify power to the zone equipment  
d.  Have a maintenance technician 
verify the FPI is set properly 
e.  Call your Accutech Representative. 
7.  To reset the zone, enter a Keypad reset, 
deactivate the test Tag, and close the 
door completely, and if necessary, clear 
the alarm on the PC. 
Zone, Delayed Egress Test 
(3101 Magnetic Locks only) 
Delayed Egress Circuitry is a feature of the 
Accutech 3101 Magnetic Lock that, due to fire 
and life safety codes, allows free egress through 
a door after 15 seconds (plus a 1 to 3 second 
nuisance delay) of constant force is applied. This 
test will evaluate this operation. 
NOTE:
 In the event of a fire, Delayed Egress 
Circuitry is disabled and the door can be opened 
immediately.  
This test should be conducted selectively; create 
a rotating schedule to test a different set of zones 
each time that periodic testing is conducted.  
Test results should be written down and kept in a 
test log.  Make your own, or use the included, to 
ensure that every monitored zone is tested.  
These test reports should become part of your 
permanent quality assurance records.