Nova-243 Outdoor LTE TDD Base Station Installation Guide 
 
2. Installation Preparation 
 
Supporting Materials 
2.1
Prepare the following support materials accordingly, as given in Table 2-1. 
Table 2-1 Support Materials 
Item 
Description 
Power cable 
< AWG16 e.g. AWG14 
Shorter than 100m 
Power plug 
The power plug connecting to the electricity supply. 
Antenna RF cable 
50 ohm feeder 
Ethernet cable 
Outdoor CAT6 
Shorter than 100m 
Antenna 
Omnidirectional, or directional antenna 
Ground cable 
16mm² yellow-green wire 
 
 
Installation Tools 
2.2
The following tools are needed during the installation. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Level bar 
Marking pen 
Knife 
Vise 
Wrench 
 
 
 
 
 
 
 
 
 
 
 
Percussion drill and 
some drill heads 
hammer 
Cross 
screwdriver 
Cable vise 
Tape measure 
 
 
 
 
 
5mm L-shape allen 
wrench 
Ladder