Nova-243 Outdoor LTE TDD Base Station Installation Guide 
10 
 
 
The GPS cable  should be as shorter as possible to reduce the influence  to signal 
strength. 
The GPS has been assembled before packing, the only installation step is to fix the GPS 
mounting bracket on the base station using the M4 x 14 screws, as shown in Figure 3-2. 
Figure 3-2 Install the GPS Antenna 
 
 
Install on Pole 
3.4
Required  diameter  of  the  pole:  30mm  ~  100mm  and  suggest  the  installation  height 
higher than 120cm. 
The  mount  bracket  has  been  assembled  before  packing,  as  shown  in  Figure  3-3.  The 
installation personnel only need to fix the assembled base station on the pole. 
Figure 3-3 Pre-assembled bracket 
 
1.  Take down the two outer omegas.