Baicells Technologies Co. Ltd. BRU3501 Manuel D’Utilisation

Page de 29
Nova-243 Outdoor LTE TDD Base Station Installation Guide 
11 
 
 
2. 
Make sure the base station’s installation height, fit the thread rod of the  assembled 
bracket to the pole, and then pass the two omegas through the threaded rods, and 
fasten the four flat gaskets, four spring gaskets, and four nuts.   
 
 
3.  Mount the base station vertically on the bracket and tighten M6 screw on the top of 
bracket using cross screwdriver to complete the installation.