Baicells Technologies Co. Ltd. BRU3501 Manuel D’Utilisation
Nova-243 Outdoor LTE TDD Base Station Installation Guide
15
corresponding terminals separately, and tighten screws.
2. Assemble power terminal.
The power terminal will be installed on the end of output direction. Refer to the
following figure to connect live wire and neutral wire.
3. Connect the power cable to PWR interface in the wiring cavity.
4. The power cable lays along the lint slot, and stretch out the wiring cavity from PWR
hole.
5. The input of the power adaptor connects to the outlet.
If the outlet is indoors, place the power adaptor indoors.
If the outlet is outdoors, place the power adaptor in a water proof box.
6. Connect the grounding point of AC adaptor to the grounding point on installation
site.