Baicells Technologies Co. Ltd. BRU3501 Manuel D’Utilisation

Page de 29
Nova-243 Outdoor LTE TDD Base Station Installation Guide 
15 
 
corresponding terminals separately, and tighten screws. 
2.  Assemble power terminal. 
The  power  terminal  will  be  installed  on  the  end  of  output  direction.  Refer  to  the 
following figure to connect live wire and neutral wire. 
 
3.  Connect the power cable to PWR interface in the wiring cavity. 
 
4.  The power cable lays along the lint slot, and stretch out the wiring cavity from PWR 
hole. 
5.  The input of the power adaptor connects to the outlet. 
 
If the outlet is indoors, place the power adaptor indoors. 
 
If the outlet is outdoors, place the power adaptor in a water proof box. 
6.  Connect  the  grounding  point  of  AC  adaptor  to  the  grounding  point  on  installation 
site.