Baicells Technologies Co. Ltd. MBS1100 Manuel D’Utilisation

Page de 40
Baicells mBS1100 Base Station Installation Guide(V100R001C00,03).docx 
 
3. Installation Preparation 
 
Support Materials 
3.1
Prepare the following support materials accordingly, as given in Table 3-1. 
Table 3-1 Support Materials for Installing Base Stations 
Item 
Description 
Power cable 
< AWG16,e.g., AWG14 
Shorter than 1150 feet 
Antenna RF cable 
50 ohm feeder 
Ethernet cable 
Outdoor CAT6 
Shorter than 330 feet 
Antenna 
Omnidirectional, or directional antenna 
Ground wire 
16mm² yellow-green wire 
 
 
Installation Tools 
3.2
The following tools are needed during the installation. 
 
 
 
 
 
 
 
 
 
 
 
 
 
Level bar 
Marking pen 
Knife 
Vise 
Wrench 
 
 
 
 
 
 
 
 
 
 
 
Percussion drill and 
some drill heads 
hammer 
Cross screw 
driver 
Cable vice 
Tape measure 
 
 
 
 
 
5mm L-shape allen 
wrench 
Torx screw 
driver 
T7 screwdriver 
head 
Ladder