Baicells Technologies Co. Ltd. MBS1105 Manuel D’Utilisation

Page de 31
Baicells mBS1105 Base Station Installation Guide(V100R001C00,02).docx 
15 
 
 
 
Install on Wall 
4.5
The wall must bear four times of the eNodeB weight. 
1.  Fit the base station on the wall, and mark the drilling locations. 
 
 
Caution: 
The arrow of the installation bracket must be upward. 
2.  Drill four 10mm diameter and 70mm depth holes in the wall by following the 
marked locations. 
3.  Check the up/down direction of the installation rack, and then fix the  eNodeB 
to the wall using M8*80 expansion screws.   
4.  Refer to the installation steps on pole, fix the eNodeB on wall. 
5.  Fasten the screw on the top of the eNodeB bracket using cross screwdriver.