Baicells Technologies Co. Ltd. MBS1105 Manuel D’Utilisation

Page de 31
Baicells mBS1105 Base Station Installation Guide(V100R001C00,02).docx 
17 
 
4.6.3  Connect RF Cable 
1.  Open the dust cap of ANT0 and ANT1 interface. 
2.  Connect one end of the RF cable to ANT0 and ANT1 interface of the eNodeB and 
fasten them with wrench. 
3.  Connect the other end of the RF cable to the external antenna. 
4.  It  is  necessary  for  ANT0 and  ANT1  interfaces  to  be  weatherproofed.  Refer  to  3.6 
Weatherproof Protection for more detail. 
4.6.4  Connect Optical Fiber 
1.  Unscrew three screws on the cover of wiring cavity using M4 cross screwdriver and 
open the wiring cavity. 
2.  Connect the optical fiber to the OPT interface in the wiring cavity. 
3.  Lay optical fibers along the wire groove, and stretch out the wiring cavity from the 
OPT hole. 
The redundant fiber should wind neatly. 
4.6.5  Connect Ethernet Cable 
1.  Connect the Ethernet cable to the ETH interface in the wiring cavity. 
2.  Lay Ethernet cable along the wire groove, and stretch out the wiring cavity from the 
ETH hole. 
4.6.6  Connect Power Connector 
Make the power cable so it can reach the distance between the installation site and the 
power supply device. Strip the 12mm insulating layer with wire stripper, which is inserted 
into the power connector.   
It is recommended that the power cord length is kept below 100m (330 feet). 
The connection steps of power cable is as follows.   
1.  Connect the power cable to the PWR interface in the wiring cavity. 
2.  The power cable lays along the lint slot, and stretch out the wiring cavity from the 
PWR hole 
3.  The input of the power adaptor connects to the outlet.