Valeport Ltd 0804IDU Manuel D’Utilisation
HydrINS 2 / HydrINS 2 Mini flow meter
Installation Manual
Page 27 / 83
5.1.3 Step 3/3: Probe insertion
Installation at the centre
1. Close the insertion valve, tighten
the probe, and lower the probe until it
stops on the ball of the valve.
the probe, and lower the probe until it
stops on the ball of the valve.
2. Place the insertion mark at the
insertion length LI
insertion length LI
1/2
calculated above.
3. Open the insert valve and lower the
probe until the insertion mark stops
against the insert valve, and then
tighten the cable gland and adjust the
position of the safety chain.
probe until the insertion mark stops
against the insert valve, and then
tighten the cable gland and adjust the
position of the safety chain.
3
LI
1/2
1
2