Quadra-Fire CB1200-B Manuel De Montage

Page de 48
September 1, 2008
7014-082D
Page  17
CB 1200 Pellet Stove 
7
Appliance Set-Up
A. Outside Air Kit Instructions 
Flex Hose
Hose Clamp
Collar Assembly
Trim Ring
Termination
Cap Assembly
Hose Clamp
Included in Kit: 1 piece of 2 inch x 3 foot flex hose, 2 hose 
clamps, 1 collar assembly, termination cap assembly, 1 
trim ring, 12 screws. 
a.  Measure distance from floor to air vent opening in appli-
ance and mark location on wall.  
Use saw to cut opening in wall. Cut a 2-1/2 to 3 inch 
(64-76mm) opening on inside wall and a 3 to 3-1/2 inch 
(76-89mm) opening on outside of house.
b.  Use hose clamp to secure flex pipe to collar assembly.
c.  Slide trim ring over flex pipe and run pipe through wall.
d.  Attach hose to outside termination cap with second 
hose clamp.
e.  Secure termination cap to outside surface.
f. 
Secure trim ring to interior wall.
g.  Snip corners and remove plate. Figure 17.1
h.  Align and secure collar assembly with 2 of the 4 holes 
as shown.  Figure 17.2.
Tools Needed: Phillips head screw driver; wire cutters; 
hole saw or jig saw.
CAUTION
Never draw outside combustion air from:
•  Wall, floor or ceiling cavity
•  Enclosed space such as an attic or garage
Figure 17.1
1.  Rear Installation 
Snip Corners 
and remove 
plate
Figure 17.2
Figure 17.3
a.  Remove rear screen and set aside.
b.  Install cover plate over hole in right rear floor.
c.  Cut a 2 inch minimum hole in the floor to accommodate 
flex hose.
d.  Attach hose to termination cap.
e.  Place rope under pedestal to close off air leaks.
Screen
Install Cover Plate
Seal Pedestal with 26 in. Rope
Figure 17.4
2.  Floor Installation 
NO
NO
Secure Collar