ZTE Corporation BS8800C200 Manuale Utente

Pagina di 167
Chapter 8 Installing Main Antenna Feeder System
F
IGURE
107 A
NTENNA
R
ACK
S
TRUCTURE
1.
Antenna arrester
2.
Welded joint
3.
Support pole 2
4.
M10×80 bolt
5.
Enhanced mast
6.
Support pole 1
7.
Support pole base
8.
Enhanced mast foundation
Installing the rack on the roof without a wall
i.
Move the rack to the roof.
Confidential and Proprietary Information of ZTE CORPORATION
117