Chapter 8 Installing Main Antenna Feeder System
Note:
If there is no guard bars on the platform, for operation
security, bind a piece of solid board to two arms of two racks
to build up a springboard. While fixing a side of antenna,
tower amplifier and feeder connection, modify the position
of board on the rack arms to fix others.
E
ND OF STEPS
.
Result
The omnidirectional antenna installation on the Iron Tower is as
shown in
.
F
IGURE
106 O
MNIDIRECTIONAL
A
NTENNA
I
NSTALLATION ON THE
I
RON
T
OWER
1.
Iron tower
2.
Tower amplifier
3.
Antenna rack
4.
Omnidirectional antenna
5.
Wire fastener
Installing Omnidirectional Antenna
on Roof
Context
Installation requirements are described as follows:
Keep away from obstructors and blind areas.