ZXSDR BS8800 C200 Installation Manual
6. Make sure the VSWR of antenna feeder not less than 1.3.
7. Make sure all outdoor jumper connectors with waterproof and
sealed handling.
8. Make sure feeders bound equally and the maximum distance
is not beyond 0.5 m.
E
ND OF STEPS
.
VSWR Test
Prerequisite
Install the system of main antenna feeder completely.
Prepare SiteMaster instrument for VSWR test.
Steps
1. Use SiteMaste to perform a VSWR test of antenna feeder. The
VSWR must be lower than 1.5.
2. If the VSWR test is failed, check the antenna feeder system,
as follows:
Whether feeder connector installation is faulty.
Whether antenna is faulty.
Whether feeder surface is damaged and the bending of
feeder is smaller than the minimal bending radius permit-
ted.
Whether arrestor installation is faulty.
3. Repeat the above steps to finish VSWR tests of all antenna
feeder cables.
Note:
The method how to use SiteMaster for a VSWR test refers to
Appendix B SiteMaster Usage.
E
ND OF STEPS
.
Checking Water-proof Processing
Steps
1. Check whether a proper waterproof handling is carried out for
all feeder connectors.
2. Make sure feeders leading into the room through the feeder
hermetic window.
E
ND OF STEPS
.