ZTE Corporation R8978S2600L Manuale Utente

Pagina di 66
Chapter 4 Operation and Maintenance
10. Tighten the jacking screw clockwise and jack the ZXSDR R8978 chassis. Then, loosen
the plate-pressing bolt anti-clockwise.
11. Pull up the ZXSDR R8978 from the pole or wall-mounting bracket, and remove the
ZXSDR R8978.
12. Put the faulty equipment into the moisture proof antistatic bag. Label the equipment
model, sector ID and fault information on the bag. Put the faulty equipment into the
carton and label the same information as the antisatic bag.
13. Reinstall all equipment parts and tighten every screw.
14. Connect all cables with waterproof and insulation protective treatment.
15. Power on the ZXSDR R8978.
16. The ZXSDR R8978 perform the self-test process after it is powered on. During the
self-test, you need to observe the indicator status and perform operations accordingly.
If...
Then...
The indicator is normal, which means
that services are restored.
The self-test and replacement are successful.
The indicator is abnormal, which means
that services are not restored.
Troubleshoot the fault and handle the relevant alarms, or
contact ZTE technical support.
– End of Steps –
4.6.2 Replacing the Optical Module
The optical module provides the optics and electrical conversion. Replacing the optical
module will interrupt all the services carried on the optical module.
Caution!
l
The optical module supports hot plugging. Before hot plugging, you must wear the
antistatic wrist strap.
l
Do not look directly at the optical module inside when replacing the optical fiber,
avoiding damage to your eyes.
Prerequisite
l
Prepare a proper optical module.
l
Take a record of the connection position at both ends of the faulty optical modules and
fibers. Mark the positions between the optical module and fibers.
Tool
Function
Antistatic wrist strap
Provides antistatic protection
4-7
SJ-20141113151137-001|2016-08-17 (R1.2)
ZTE Proprietary and Confidential