ZTE Corporation RSUC1930 Manuale Utente

Pagina di 53
ZXSDR RSUC User Manual
4. Insert SFP cables into the interfaces TX0RX0 to TX5RX5 of
the BBU FS board according to the markings 0-5, as shown
in
.
F
IGURE
19 FS B
OARD
C
ONNECTING TO THE
BBU
5. Bundle SFP cables.
6. Remove temporary labels and affix engineering labels.
E
ND OF STEPS
Installing the RF Jumper
Prerequisites
The ZXSDR RSUC RF cabinet and other modules have already been
installed.
Context
The RF jumpers for the three ZXSDR RSUC go through the water-
proof module on the right.
Remove the front baffle of the base before installing the RF
jumpers and reseat the front baffle after all jumpers are com-
pletely installed.
Steps
1. Connect the RF jumpers to ANT1 and ANT2 interfaces of RSU
from left to right.
2. Wear the waterproof rubber plug after every two RF jumpers
are installed.
3. Insert the horizontal and longitudinal slide blocks and use the
hexagon ring wrench to fasten them.
Caution:
Clamp the waterproof rubber plug tightly and make sure that
the unused cabling aperture wears the plug.
4. Repeat the preceding steps to install other RSU-related
jumpers.
E
ND OF STEPS
Result
shows the completion of installing the RF jumpers.
40
Confidential and Proprietary Information of ZTE CORPORATION