ZTE Corporation ZXG-OB06 Manuale Utente

Pagina di 117
 
ZXG10 OB06 ZTE  Integrated Outdoor GSM Base Station Technical Manual 
56 
Confidential and Proprietary Information of ZTE CORPORATION 
2.  Wireless channel release 
The wireless channel release procedure is shown in Figure 41. 
F
I G U R E  
4 1
 
W
I R E L E S S  
C
H A N N E L  
R
E L E A S E
 
MS
LAPDm
FURRM
HPIMan
LAPD
BSC
OAMM
( RF CHAN REL) 
DL_DATA _IND (RF CHAN REL
)
M PH_RRCm dTo
CHP ( CHP RF 
CHAN REL)
M PH_ CHPIndToRR 
( CHP RF CHAN 
REL ACK)
DL _DATA_REQ
( RF CHAN REL ACK
)
( RF CHAN 
REL ACK) 
 
The BSC releases a wireless link that is not used any longer. 
When an activated wireless channel is not used any longer, the BSC 
will send a RF channel release message (RF CHAN REL) to the related 
TRX and channel. The CHP module processes the channel release. 
When the related resources are released, the OB06 returns a RF 
channel release acknowledgement message (RF CHAN REL ACK) to the 
BSC. If the CHP cannot release the channel successfully, the FURRM 
will send the ERROR REPORT message to the BSC. 
SACCH Procedure 
1. Measurement report 
The data from the MS and OB06 measurement results are processed 
by the BSC and will be used for the transmission power control and 
handover preparation. 
The MS measurement result is in the (RR) MEASurement REPort 
message and will be reported once every SACCH block (480 ms), or if 
the SACCH is being used by other signaling, reported once every two 
SACCH blocks (960 ms). The TRX measures the level and quality of the 
received signals in the current uplink channel. The average time is the 
period of one SACCH block. The (RR) MEASurement REPort message 
that is sent by the MS to the OB06 contains the measurement results 
for the dedicated channel and adjacent cells. 
The OB06 and MS measurement results form basic original data that 
must be transmitted on the Abis interface. See “Basic measurement 
report” for details. In addition, the OB06 and BSC also support 
preprocessing for these basic measurement data in OB06, to lessen the 
signaling load on the Abis interface. See “Measurement report 
preprocessing” for details. 
The FURRM receives the CHP measurement report ahead of the MS 
measurement report. As a result, when the FURRM triggers group 
sending of the Abis MEAS RESULT according to the CHP measurement 
report, the problem of timing adjustment arises.