2. Power control 
The MS power control is shown in Figure 44. 
F
I G U R E  
4 4
 
M S   P
O W E R  
C
O N T R O L
 
MS
LAPDm
FURRM
HPIMan
LAPD
BSC
OAMM
(M S POWER 
CONTROL) 
DL _DATA_ IND (M S 
POWER CONTROL)
M PH _RRCm dToCHP 
(CHP SET M S 
POWER)
 
The BSC sets the MS power control parameters according to the TRX 
requirement. 
The initial parameters are set in the CHAN ACTIV message by the BSC. 
If these parameters are to be changed, the BSC will send the MS 
POWER CONTROL message to the TRX. 
The OB06 power control is optional, which is indicated by the 
parameters in the MS POWER CONTROL or CHAN ACTIV message. By 
changing the frame header of the power level L1 that is sent to the MS, 
the TRX tries to control the power control parameter within certain 
range according to the message requirement (the CHP module 
implements this operation). 
When the OB06 executes the MS power control, the BSC can change 
the MS power parameter during the connection (change by levels, for 
example). 
The MS POWER CONTROL and CHAN ACTIV messages must contain an 
MS-allowed maximum power value. 
The procedure of BS power control executed by the BSC is shown in 
Figure 45. 
F
I G U R E  
4 5
 
B S   P
O W E R  
C
O N T R O L
 
MS
LAPDm
FURRM
HPIMan
LAPD
BSC
OAMM
(BS POWER 
CONTROL) 
DL_ DATA_IND (BS 
POWER CONTROL)
M PH_RRC m dTo
CHP(CHP SET 
BS POWER) 
 
This optional procedure can have the BSC set the TRX transmission 
power level or the parameter that the TRX uses to control the TRX 
transmission power. 
The initial parameters are set in the CHAN ACTIV message by the BSC. 
If these parameters are to be changed, the BSC will send the BS 
POWER CONTROL message to the TRX.