Chapter 2 Installation Preparations 
 
Confidential and Proprietary Information of ZTE CORPORATION      13 
Unpacking Inspection 
The ZTE Engineers must perform the unpacking inspection along 
with operator’
s side engineers.  
1.  Check whether the total pieces are correct, packages are in 
good condition, and the destination location matches the 
installation location. If the results are all normal, start 
unpacking inspection.  
2.  The equipment inspection list and unpacking inspection 
report are contained in package #1. First open the #1 
package and take out the  Unpacking Inspection Report
Check the total number of the goods against the inspection 
list and record it for filing.  
3.  If any item is missing, lack, incorrect, excessive or damaged, 
the reason  must be found out, and the engineering 
supervisor should fill in the  Unpacking Inspection Feedback 
Table
, which must be fed back to ZTE in time for handling.  
 
 
Note:
 When the equipment is moved a hotter and damper place, 
wait for 30 minutes before unpacking the equipment. Otherwise, 
moisture may condense on the surface of the equipment and damage 
the equipment as a result.  
 
Wooden Case Unpacking Procedure  
1.  Insert the screwdriver or claw hammer into the tab hole on 
the cover plate of the wooden case, and turn the tab straight; 
2.  Lift and remove the cover plate after all tabs have been 
turned straight; 
3.  Turn straight the tabs of the plates on four sides of the 
wooden boxes, and remove the plates.